Development Projects - Thalanga - West 45

Kagara Ltd undertook in-fill diamond drilling at the West 45 deposit during 2011, with encouraging results returned from several holes including:

  • 21.9 metres grading 16.8% zinc, 10.6% lead, 1.0% copper and 208 grams per tonne silver in hole TH644.

The new West 45 combined indicated and inferred resource estimate is 591,000 tonnes grading 8.3% Zinc, 3.5% Lead, 0.6% Copper, 69g/t Silver and 0.3g/t Gold.

Australian Mine Design and Development (AMDAD) have completed a mine design and mining schedule. The box cut has been excavated, and the portal construction started in preparation for development in October 2011.